A Hi-spec conversion of the old Water Turbine station in Betws Y Coed North Wales.
The property was upgraded throughout and is now a fully established and successful AirBNB accommodation.
We provided full design and installation - the fire suppression throughout the building is provided by a stored and pumped system in a dedicated storage area to allow for maintenance and servicing which we carry out annually at a cost cheaper than a boiler service